Blog
PCBs and Production
Boards arrived yesterday.
Parts have been sorted and packed.
CEE V1.0 has been assembled and tested. This board revision added a single red LED for status indication.
We're sending the supplies to our assembly house tomorrow and we should have CEEs in our hands in about three weeks.
The case is nearing production as well. We're getting the logo printed on the inside of the top panel, for an even nicer look than the laser-etched photos you saw in our previous post. Acrylic is in the mail to our cut/print shop.